Item Coversheet

Request for City Commission Action Page



Heading as displayed on the Agenda:

Public Works, technical Services Division - Zev Cohen and Associates, Inc. - Derbyshire Park Neighborhood Sidewalks Project - Phase 2 - Work Authorization No. 33  (pp. 296-314)

Item as displayed on the Agenda:

Resolution approving Continuing Services Work Authorization No. 33 (Contract No. 2006-21-ZC, Res No. R08-258) for Zev Cohen & Associates, Inc., 300 Interchange Blvd., Suite C, Ormond Beach, FL 32174, to design the Derbyshire Park Neighborhood Sidewalks Project – Phase 2 for a total cost of $58,494.  The Derbyshire Park Neighborhood Sidewalks Project – Phase 2 consists of 5 to 6 foot wide concrete sidewalks on the following streets which will close the gaps throughout the Derbyshire Park Neighborhood and connect to Derbyshire Park:

 

•           Vine St (Mason Ave to Brentwood Dr)

•           Brentwood Dr (Berkshire Rd to Nova Rd)

•           4th St (Lewis Dr to Derbyshire Rd)

•           5th St (Lewis Dr to Derbyshire Rd)

•           5th /4th St (Derbyshire Rd to Vine St)

•           Vine St (4th St to 6th St)

•           6th St (Vine St to Nova Rd)

 

This project will also include stormwater drainage improvements, pedestrian safety enhancements, and Historical and Cultural Resource Assessments.  This is an Florida Department of Transportation (FDOT) Local Agency Program (LAP) Project which will provide reimbursement for the construction costs.  The design costs will not be covered by the LAP Agreement but will count towards our City Matching Funds.  Funds available in the Stormwater Improvement Construction Fund.

 

Recommendation:  Deputy Public Works Director recommends adoption of the Resolution. 

ATTACHMENTS:
Description
Agenda Summary
Memo to CM
Backup
SOF